AWorthyOpponent
Member
For those of you that are waiting for your Florida CCW to arrive, I have an update. My fiance sent in her application on Feb 3, 2009 and the check cleared my account on the 6th. The Permit arrived this afternoon, July 3rd. That means that the permit that has to be issued within 90 days (or three months) actually took just under 6 months...
I called today, asking to speak to a supervisor, to ask them about it and they said that it is 90 days from the time they begin PROCESSING the application. Technically they are withing the 90 day "shall issue" requirement with this and are still able to keep up with demand. It was not an issue, as I usually carry when we go out, but it is frustrating that it took this long nonetheless.
P.S. She looks Hotter now that i know she has that Kel-Tec by her side...(she has a small frame and wears tighter clothing...the P3AT is well hidden and she can shoot bulls-eyes at 10 yards)
<I don't post pics of guns that aren't mine, but it looks like this...>
I called today, asking to speak to a supervisor, to ask them about it and they said that it is 90 days from the time they begin PROCESSING the application. Technically they are withing the 90 day "shall issue" requirement with this and are still able to keep up with demand. It was not an issue, as I usually carry when we go out, but it is frustrating that it took this long nonetheless.
P.S. She looks Hotter now that i know she has that Kel-Tec by her side...(she has a small frame and wears tighter clothing...the P3AT is well hidden and she can shoot bulls-eyes at 10 yards)
<I don't post pics of guns that aren't mine, but it looks like this...>
Last edited: