sully
Member
I am looking for some ideas for scoring. I am putting together a match. This is not IDPA or USPSA, so we are not applying those rules and guidelines.
Some stages will be on steel and shot for time. While other stages are shot for score within a set period of time.
If we wanted to make each stage equal in value, whether shot for time or score, is there a way of assigning an equal value to each. Meaning can you assign a score or percentage on a stage that is strictly shot for the best time? I realize that in doing so the fastest shooter would be the base line. So is there a way to make a timed event equal in point value or percentage when compared to a scored event.
Greg Sullivan "Sully"
Chief Instructor
www.TheDefensiveEdge.com
Some stages will be on steel and shot for time. While other stages are shot for score within a set period of time.
If we wanted to make each stage equal in value, whether shot for time or score, is there a way of assigning an equal value to each. Meaning can you assign a score or percentage on a stage that is strictly shot for the best time? I realize that in doing so the fastest shooter would be the base line. So is there a way to make a timed event equal in point value or percentage when compared to a scored event.
Greg Sullivan "Sully"
Chief Instructor
www.TheDefensiveEdge.com
Last edited: