OrangeCat
Member
- Joined
- Mar 24, 2019
- Messages
- 407
Upper assembled..... mostly need the bolt and associated bitz and I couldn't find the roll pin for the gas block, either I dropped it and it rolled into the '5th dimension' or it didn't come with the gas block. Dinged the upper rail on the receiver on the tool box too so a trip to the hardware store for some black paint and a roll pin is in order.
Like the fde and the black more than I thought I would was a little disappointed that I couldn't find a black or od rail but it's much better in person the thread protector needs a washer but it's there as a temporary measure for right now.
Everything fit together and nothing seems like it's interfering with anything else so far so good once I get the bolt carrier group I'll slap it on the stag arms and see how it functions.
The angled tabs that hold the atlas on seem pretty legit it's a little bit of a pain to get it on because they tend to move together so you need to get them nice and aligned before you notch it down but once it's down by god it's down.
Overall for a budget/the government sent me money build it's pretty nice.
Like the fde and the black more than I thought I would was a little disappointed that I couldn't find a black or od rail but it's much better in person the thread protector needs a washer but it's there as a temporary measure for right now.
Everything fit together and nothing seems like it's interfering with anything else so far so good once I get the bolt carrier group I'll slap it on the stag arms and see how it functions.
The angled tabs that hold the atlas on seem pretty legit it's a little bit of a pain to get it on because they tend to move together so you need to get them nice and aligned before you notch it down but once it's down by god it's down.
Overall for a budget/the government sent me money build it's pretty nice.