I went a little nutty, some may say. I decided I wanted a rock solid mount for my Lee Load Master press.
So the first thing I did, of course, was cut a hole through my basement floor.
I dug the hole larger than the hole in the floor. That way the cement I poured would "lock in" under the floor
I got a steel plate. I made a cutout in the front of it for the ram. This allowed me to move the press further back so the two front mount holes would be further from the edge of the plate.
I had it welded on top of a 2" steel pipe with pretty think walls. I put a 3/8" bolt through near the bottom to help anchor the post in the cement.
This is the finished product. Now all I have to do is build a bench around it.:banana:
A video should follow shortly
So the first thing I did, of course, was cut a hole through my basement floor.
I dug the hole larger than the hole in the floor. That way the cement I poured would "lock in" under the floor
I got a steel plate. I made a cutout in the front of it for the ram. This allowed me to move the press further back so the two front mount holes would be further from the edge of the plate.
I had it welded on top of a 2" steel pipe with pretty think walls. I put a 3/8" bolt through near the bottom to help anchor the post in the cement.
This is the finished product. Now all I have to do is build a bench around it.:banana:
A video should follow shortly