Loading 9mm, y Hornady LnL case feeder binds rotating the next case into the drop tube and the next case binds on the side of the rotating base metal block.
I end up twisting the block to free up cases and lifting cases to have the block return. Not fun.
Suggestions setting up the distance the top feeder tube should be from the rotating block?
Suggestions for setting up the insert?
[Sorry I don’t have the official names of the pieces. The docs are downstairs and I am sitting by the fire with a bourbon.]
I end up twisting the block to free up cases and lifting cases to have the block return. Not fun.
Suggestions setting up the distance the top feeder tube should be from the rotating block?
Suggestions for setting up the insert?
[Sorry I don’t have the official names of the pieces. The docs are downstairs and I am sitting by the fire with a bourbon.]